Showing posts with label Weiser house. Show all posts
Showing posts with label Weiser house. Show all posts

Tuesday, September 2, 2014

Weiser Home Tour

just a few BEFOREs to remember...
the striped bathroom, the gold window by the front door, the "lovely" chandelier, oak cabinets, popcorn ceiling... all straight from 1973!






After...
We resided the house with cement board siding and replaced all windows, molding, door knobs, and hinges.

kitchen (add bead and baton and command center, spray painted brass light yellow, and added backing to the island, windows to floor and molding treatment)


Dining Room- bead and baton and molding around windows (made a world of difference) and built in mantle shelf

Command Center in the kitchen
Hall-upcycled chandelier, bead and baton, and huge frames

Entry Way- New front door and window, bead and baton, removed wall paper and painted dark gray accent wall


Living room- scrapped popcorn ceiling, added built in desk and mantel over fire place, replaced old wood stove with pellet stove, painted walls gray, added curtains, stained banisters dark oak.  (the first 3 pictures are after the popcorn scraping and before the re-texturing)

Master Bedroom-painted closet doors white from white and gold, new hardware, and added closet shelving and bars (Audrey's crib was just recently moved to Layla's hence the baby decor and the master bath is the biggest joke ever-the tub is tiny and the shower is about 4' high- never used it)

Landon and Alaina's room-painted gray, replaced light, added closet doors- barn style

Layla and Audrey's room-painted aqua, added ruffle curtains, made built in shelving in closet

Alyse and Lexi's room- scrapped pop corn ceiling, added crown molding, wide base board molding, and closet molding, painted dark aqua

Downstairs bath- scrapped pop corn ceiling, added crown molding, painted cabinets gray, replaced light fixture, refinished vanity light and medicine cabinet white, added towel hook and curtains

Half bath-  removed striped wall paper, painted, new toilet, new sink, new fixtures, cabinet, mirror, hardware, and molding.  Added tile floor and tile back splash.  (the longest bathroom remodel ever over two years to complete- I painted the molding around 3 a.m. the night before we left!)
Upstairs bath-nothing, it's still as 1970s today and when we arrived

We were 2 bathroom remodels and a layer of gray paint over the ugly yellow tan away from being done.   Well unless, we did a major renovation on the heating, switching from electric heat to central gas- or I could talk Scott into painting the wood ceiling white and replacing the rock entry, laminate kitchen, and carpeted dining room to wood floors- hah!  Ready to move on...  but this time we are starting 30 years newer and with beatiful ceiling texture and gray walls!!!!

Monday, September 1, 2014

The WORST project ever!

Now, don't get me completely wrong when I say it was the worst project ever... it was the hardest and messiest, but it had awesome results!  For the 3 years that we lived in that house, I despised and hated the basement ceiling and the paint color throughout the house.  The basement ceiling was popcorn texturing with two bad patch jobs and the color of paint throughout the house!  I couldn't repaint the basement, because the horrid color on the walls was on the popcorn ceiling and knowing to paint the popcorn ceiling white would make it all the harder to scrape off eventually.  I couldn't repaint the kitchen, dining, and upper and lower halls because they all let into one another!   I had scrapped the bathroom and the bedroom by myself, but I was not taking on the huge ceiling alone!  Finally, we got it done, and I got to sit and stare at it for about 5 minutes before we moved (if that)!!  Yeah, that was the sad part.  But schedules, pregnancies, and babies didn't allow us to get it done any sooner.  I just hope it adds to the resell value so we get something out of our major hard work!!  We scrapped it off in July.  The compound they had used was not conducive to scrapping I tell ya!  It was the single hardest day of work ever.  Scott and I worked till 1:30 a.m., cleaned up our mess, and then it sat bare until we recovered and we figured out what to do next.  We actually got a bid to have it professionally done from there, but at $1100 we decided to bravelyen though we had no idea what we were doing!  My bother Mike spent a day off working on continue on ev it and teaching us how to re-patch their really bad patch job and how to tape and mud- Thank you Mike!  Pretty much the whole ceiling got mudded and sanded and mudded and sanded at least twice.  

 The top two pictures show it after we scrapped the popcorn and how it sat for a month.  Yes, ugly- but still better than popcorn!  The bottom, it's back in construction zone for the rest of it... Scott is texturing.


At least we spent a lot of time together!
Scott's nice mud treatment on his feet and my new summer manicure!

I painted the ceiling, took down the draping, and vacuumed, vacuumed, and vacuumed!  And without further ado, see my beautifully textured white ceiling and gray walls!  (no sign of either patch I might add!)
I have to also mention that Scott was in a seriously intense chemistry at BSU during this time.  He had mass amounts of homework and we somehow finished not only this but all the other jobs that needed done before we moved out!  Sleep is what neither one of us got much of!   I may have heard more than once, questioning on why I had to scrape that pop corn ceiling and get us into this!  I also heard that he loved my ambition to do projects and to actually DO them along side, though tough mans work!

Wednesday, January 8, 2014

deck project

I also found this post in the drafts.  I have no idea why it didn't get published either.  It's from March of 2013.


One of our latest projects has been the deck-

we built this sectional and end table
(still needs stained)
the inspiration/plans came from ana-white knock off wood plans, although we used 2x4s instead of 1x4s and made the backs taller with 2 bars across


we built the fence and gate
and the deck railings and gate
(we thought we would close off the deck with gate and all so that Landon could have full deck access with a place to play outside to his hearts content since the yard is too big to turn him free on his own yet)




we still got lots of staining to do this summer :)

and yes, I have maternity work clothes and could still bend enough :)  my hips did ache at the end of day though!

Thursday, March 14, 2013

Landon's closet doors & room

one of my most favorite projects of all times is Landon's closet doors- it was fun to do and I love the results

it's been fun to create a boys room for a change :)

we bought brand new pretty wood and then we hammered, scratched, and put in screw/nail/random tool shapes into the wood, stained it, and built 4 bi folding closet doors

Scott enjoyed the "distressing" of the wood part

finally hung up Landon's baby toes
they were suppose to be black and white for my mother-in-law's OB unit but out of the 55 pictures I edited and ordered for her, this one somehow missed the black and white and so Landon got his toes back to be remembered for ever on a huge framed canvas :)  oops!

world map
this project was fun too, until the modge podge part and we couldn't get all the wrinkles out
wrinkles give it character right?  at least that's what I tell my self, because otherwise I love it

Scott enjoyed burning the map part

and we painted the walls, but the colors are not near accurate in the pictures
his room is a hard room to photo since there is only one window to let in natural light, but in real life I love the colors!
in a few more months that crib will go and we'll build some kind of cool bed frame with distressed wood


 a new light fixture :)

the little man himself on the rocking horse from my little girl days 

still more progress to be made in there but it's coming along!

front door & entry before and afters

this was last years project that we just put the final piece of molding on- yea!

before-note the gold window that they must have stole from the Brady Bunch set

after- new windows, front door, and bead and batten on the walls

curtain?  haven't decided if its the right one for there, but it hangs there until I find one I like better :)

we've painted the accent wall on the left, the tanish yellow color all over the rest of the house will go someday too!  I despise the color and the flatter than flat paint that they used that doesn't clean well, but it is a big undertaking since entry, kitchen, dining, upstairs all and downstairs are all open... but one of these day's it will turn more grayish :)


"Weideman Family Rules" sign I created 

up close top

and bottom half 


I usually have this window decorated for a holiday or season but it's blank today and today is the day I'm taking the pics and posting :) 

{Light BEFORE} 
also from the Brady Bunch set

{Light AFTER a minor surgery and spray paint}


Wednesday, January 23, 2013

Down Stairs Bathroom update

Scott and I have tackled a few projects lately (very fun!)

Here's our updated downstairs bathroom
             Before:                                                   After:
Popcorn ceiling                                                                 No popcorn ceiling
ugly yellow tan paint                                                         fresh coat of paint
old window                                                                      new window
towel bar                                                                         towel hooks
brass door knobs & hinges                                               black door knobs & hinges
cream outlets and light switches                                        white outlets and light switches
oak cabinets                                                                    distressed gray cabinets
ugly small baseboard molding                                           wide baseboard molding and crown molding
ugly ceiling light                                                                newer ceiling light (from Landon's room)





P.S.  Crown molding is not for whimps!!!!!!!!!!!!  
(it a brutal test to patience and shoulders!)

Saturday, April 2, 2011

spring break/new house pictures

The day before spring break the Weiser River flooded, we took a drive to see the more of the flooding and stopped to pet the pet zebra.

Spring break was filled with family time, I don't think the girls had a moment without playing with cousins!  I hardly had any pictures of spring break, so most of my house pictures were "borrowed" from my Stacy's blog (thank you!).

The girls and I had my family over for a day to see our new house.

my 72-year-old mom pushing Layla around in a box! 
 the family at meal time
 from the front
checking out the pool- or at least the cover full of yucky water (can't wait to see it clean!)

 my niece Alshey with the cat the came with the house
we named him mouser, since he catches mice and leaves them chewed up on the deck (gag!)
 the backyard

girl talk in the kitchen while the kids had a blast playing in an empty house all day (and not even a toy to pick up!)
it was a very fun day with family and it actually felt like we lived in Idaho instead of on vacation here- we still don't actually live in our house because we have yet to have hot water.  Scott will be here on Friday with our stuff, being here as a family and unpacking will make it feel real!

Spring break ended with a quick visit from Scott for Ana and Isaac's baptisms.  The girls had no idea daddy was coming.  We got back from the airport at 1:30 a.m. so the girls had a special suprise Saturday morning!  Sunday I took him back to the airport :(   It was a great spring break!